Brookside Energy Center

Combined-cycle natural gas power generation facility on a half-acre lot producing three megawatts of fuel cell capacity. Nickle installed all electrical infrastructure from the turbine hall through the switchyard, including precision conduit routing, medium-voltage cable terminations, and full SCADA control wiring. This was the first installation of the Bloom Energy Boxes on the East Coast, with 90 units making it the largest installation at the time of completion. Over 25,000 feet of piping and conduit were installed.

PROJECT HIGHLIGHTS

First Bloom Boxes on East Coast
90 fuel cell units installed
25,000 ft of piping and conduit
Full SCADA integration
Project Brookside Energy Center
Location Newark, Delaware
Category Solar
General Contractor Bloom Energy Corporation